• Precast Shafts – Green Square – Design and Drawings
  • Caisson Propping Arrangement – Green Square – Design and Drawings
  • Stainless Steel Pipe Diversion Structures – Green Square – Design and Drawings
  • Lee Street Precast Wall Units – Design and Drawings
  • Megalong Project – Design
  • Round the Bay Walk – Design
  • Design and Construct ‘Vertical Access Shafts’ for the STEP (T-03 and T-02)
  • Sewer Links Contract 1 & 2 (LS-01 & LS-02)
  • Design and Construct Strategic Tunnel Enhancement Programme Deep Tunnel Sewer Contract T-03
  • Design and Construct Strategic Tunnel Enhancement Programme Deep Tunnel Sewer Contract T-02

photo-4-civil-contracting-caisson-shaft photo-3-precast-concrete-caisson-shafts